Manufactur standard Recuperative Heat Exchanger Supplier - 2MM Self Leveling Epoxy Floor Paint – Airwoods

JD-2000 is a two-component solvent-free epoxy floor paint. Nice appearance, dust &corrosion resistant and easy to clean. The flooring system can bond well with the solid base and has good abrasion and wearing resistance. Meanwhile, it has certain toughness, brittle-resistance and can stand a certain weight. The compressive strength and impact resistance ability is also excellent. Where to Use: It is mainly used for the non-dusty and non-bacteria areas like food factory, pharmaceutical factory, hospital, precision machinery, electronic factory, etc. Technical Data: Drying time:  Touch dry: 2 hours        Hard dry: 2 days Compressive strength (Mpa): 68 Impact resistance strength (Kg·cm): 65 Flexural strength (Mpa): 40 Adhesive force grade: 1 Pencil hardness (H): 3 Abrasion resistance(750g/1000r, zero gravity, g)≤0.03 Resistance to engine oil, diesel oil for 60 days: no change. Resistance to 20% sulfuric acid for 20 days: no change Resistance to 20% Sodium hydroxide for 30 days: no change Resistance to toluene, ethanol for 60 days: no change Service life: 8 years Recommended Consumption: Primer: 0.15kg/sqm           Undercoat: 0.5kg/sqm+Quartz Powder: 0.25kg/sqm             Top coat: 0.8kg/sqm Application instructions: 1. Surface preparation:Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles, oil, grease, and other contaminants. 2. Primer: Prepare a barrel, pour JD-D10A and JD-D10B in it based on 1:1. Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/㎡.The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours. Inspection standard for the primer: even film with certain brightness. 3. Undercoat: Mix WTP-MA and WTP-MB based on 5:1 first, then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure. Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface. 4. Top coat: Mix JD-2000A and JD-2000B according to 5:1 and then apply the mixture with trowel. The consumption quantity is 0.8-1kg/sqm. One coat is enough. 5. Maintenance: 5-7 days. Don’t use or wash with water or other chemicals. Clean up Clean tools and equipments first with paper towels, then clean the tools with solvent before the paint hardens